uMzinyathi Upland Stream
📍 uMzinyathi, eThekwini-adjacent, KwaZulu-Natal
Media content in progressImpact score
Standard priorityEvery Bridging Africa site is assessed on the same four measures, by the same team, so this number can be compared directly against any other project on this site.
How dangerous the crossing is today: flood frequency, water speed and recorded incidents.
How many people depend on this crossing, and how often they have to make it.
What sits on the other side: schools, clinics, work, and whether any alternative route exists.
People served per Rand of build cost. It sets the order we build in, never whether we build.
A lower score is not a rejection. Every project listed is one we intend to build; the score sets the order, not the outcome.
Standard span, benign hydrology. Fastest deployment class, under 4 months.
Each measure is scored 1 to 5 from field assessment, CSIR flood data and community records, then weighted and converted to a mark out of 100.
Who is affected
Around 1,500 residents in upland communities using the crossing for school and homestead access.
What has happened at this site
Erosion and bank failure following flood events have been documented, making the informal crossing steadily more hazardous each season.
Public benefit when complete
Stabilises a deteriorating crossing and secures school access for 300 children before the site becomes impassable.
Your donation costs less than you think.
Bridging Africa NPC is a SARS-registered PBO (334-275-NPO). Your donation qualifies for a Section 18A tax deduction, up to 10% of your taxable income per year.
Calculate your tax benefit →