Umlazi – Wema Hall tributary
📍 Umlazi, eThekwini, KwaZulu-Natal

Impact score
Flagship priorityEvery Bridging Africa site is assessed on the same four measures, by the same team, so this number can be compared directly against any other project on this site.
How dangerous the crossing is today: flood frequency, water speed and recorded incidents.
How many people depend on this crossing, and how often they have to make it.
What sits on the other side: schools, clinics, work, and whether any alternative route exists.
People served per Rand of build cost. It sets the order we build in, never whether we build.
A lower score is not a rejection. Every project listed is one we intend to build; the score sets the order, not the outcome.
Standard span, benign hydrology. Fastest deployment class, under 4 months.
Each measure is scored 1 to 5 from field assessment, CSIR flood data and community records, then weighted and converted to a mark out of 100.
Who is affected
School routes; evacuation centres; dense residential wards
What has happened at this site
Repeated flooding of evacuation centres and school routes; very high pedestrian traffic; no alternative route.
Your donation costs less than you think.
Bridging Africa NPC is a SARS-registered PBO (334-275-NPO). Your donation qualifies for a Section 18A tax deduction, up to 10% of your taxable income per year.
Calculate your tax benefit →