Tsomo / Cofimvaba Rural Link
📍 Intsika Yethu, Chris Hani District, Eastern Cape
Media content in progressImpact score
Flagship priorityEvery Bridging Africa site is assessed on the same four measures, by the same team, so this number can be compared directly against any other project on this site.
How dangerous the crossing is today: flood frequency, water speed and recorded incidents.
How many people depend on this crossing, and how often they have to make it.
What sits on the other side: schools, clinics, work, and whether any alternative route exists.
People served per Rand of build cost. It sets the order we build in, never whether we build.
A lower score is not a rejection. Every project listed is one we intend to build; the score sets the order, not the outcome.
Additional engineering measures required, such as raised approaches, scour protection or debris management.
Each measure is scored 1 to 5 from field assessment, CSIR flood data and community records, then weighted and converted to a mark out of 100.
Who is affected
Roughly 2,600 residents, with 600 schoolchildren crossing a river that swells dangerously through the summer season.
What has happened at this site
Mthingwevu Luqolweni waited 13 years for a municipal bridge while repeated drownings and near-drownings occurred as learners crossed the swollen Mthingwevu River — matriculants missed final exams. In 2024 households each contributed R400, raising R28,000 to build 'Ibholorho yabantu' (The People's Bridge) themselves; the municipality then ordered its demolition on safety grounds.
Public benefit when complete
Delivers the engineered, safe crossing this community has been demanding for over a decade — protecting 600 schoolchildren and restoring reliable village-to-town access for 2,600 people.
Your donation costs less than you think.
Bridging Africa NPC is a SARS-registered PBO (334-275-NPO). Your donation qualifies for a Section 18A tax deduction, up to 10% of your taxable income per year.
Calculate your tax benefit →