Seeking fundingFastest to deploy

Makhanda Low-Lying Wards Crossing

📍 Makhanda, Makana Municipality, Eastern Cape

Impact score

Standard priority

Every Bridging Africa site is assessed on the same four measures, by the same team, so this number can be compared directly against any other project on this site.

65
/ 100
Life-safety & flood risk2/5 · counts 35%

How dangerous the crossing is today: flood frequency, water speed and recorded incidents.

Population impact4/5 · counts 30%

How many people depend on this crossing, and how often they have to make it.

Access criticality3/5 · counts 20%

What sits on the other side: schools, clinics, work, and whether any alternative route exists.

Cost-efficiency5/5 · counts 15%

People served per Rand of build cost. It sets the order we build in, never whether we build.

How this compares0 to 100 across all our sites
65
Later phase
under 55
Standard priority
55–69
High priority
70–84
Flagship priority
85+

A lower score is not a rejection. Every project listed is one we intend to build; the score sets the order, not the outcome.

Low complexity

Standard span, benign hydrology. Fastest deployment class, under 4 months.

Standard spanTown-fringe logistics favourableLow complexity

Each measure is scored 1 to 5 from field assessment, CSIR flood data and community records, then weighted and converted to a mark out of 100.

Who is affected

Around 2,400 residents in low-lying township wards, with 500 children crossing for school.

What has happened at this site

Periodic town flooding cuts school routes and town access for low-lying wards; urgency is lower than the province's flagship sites.

Public benefit when complete

Reliable school and town access for 2,400 residents, deliverable at low complexity and cost.

Your donation costs less than you think.

Bridging Africa NPC is a SARS-registered PBO (334-275-NPO). Your donation qualifies for a Section 18A tax deduction, up to 10% of your taxable income per year.

Calculate your tax benefit →