KwaNgwenya Crossing
📍 Jozini area, uMkhanyakude District, KwaZulu-Natal
Media content in progressImpact score
High priorityEvery Bridging Africa site is assessed on the same four measures, by the same team, so this number can be compared directly against any other project on this site.
How dangerous the crossing is today: flood frequency, water speed and recorded incidents.
How many people depend on this crossing, and how often they have to make it.
What sits on the other side: schools, clinics, work, and whether any alternative route exists.
People served per Rand of build cost. It sets the order we build in, never whether we build.
A lower score is not a rejection. Every project listed is one we intend to build; the score sets the order, not the outcome.
Additional engineering measures required, such as raised approaches, scour protection or debris management.
Each measure is scored 1 to 5 from field assessment, CSIR flood data and community records, then weighted and converted to a mark out of 100.
Who is affected
Approximately 2,200 residents using the crossing for schooling and daily community movement.
What has happened at this site
Site-specific research pending; the crossing carries the highest flood-risk sub-score in its group. COORDINATES REQUIRE FIELD VERIFICATION.
Public benefit when complete
Removes a high-risk crossing from daily use for 2,200 people and secures school routes for 450 children.
Your donation costs less than you think.
Bridging Africa NPC is a SARS-registered PBO (334-275-NPO). Your donation qualifies for a Section 18A tax deduction, up to 10% of your taxable income per year.
Calculate your tax benefit →