KwaDuna River Crossing
📍 Zululand District, KwaZulu-Natal
Media content in progressImpact score
Flagship priorityEvery Bridging Africa site is assessed on the same four measures, by the same team, so this number can be compared directly against any other project on this site.
How dangerous the crossing is today: flood frequency, water speed and recorded incidents.
How many people depend on this crossing, and how often they have to make it.
What sits on the other side: schools, clinics, work, and whether any alternative route exists.
People served per Rand of build cost. It sets the order we build in, never whether we build.
A lower score is not a rejection. Every project listed is one we intend to build; the score sets the order, not the outcome.
24 m span and/or demanding site, needing deep foundations, extreme flood loads or difficult terrain.
Each measure is scored 1 to 5 from field assessment, CSIR flood data and community records, then weighted and converted to a mark out of 100.
Who is affected
Multiple villages depend on this crossing for school, clinic and regional road access.
What has happened at this site
Site-specific incident research is still pending. Regional 2022 flood impacts across northern KZN are extensively documented. COORDINATES REQUIRE FIELD VERIFICATION.
Public benefit when complete
Permanent access for approximately 2,500 residents across several villages to schools, clinic services and the regional road network.
Your donation costs less than you think.
Bridging Africa NPC is a SARS-registered PBO (334-275-NPO). Your donation qualifies for a Section 18A tax deduction, up to 10% of your taxable income per year.
Calculate your tax benefit →