Bridge serving Intake, Tafelkop, Nkoselweni, and Zwelibomvu areas
📍 Southern eThekwini / Umbumbulu Periphery, KwaZulu-Natal

Impact score
Flagship priorityEvery Bridging Africa site is assessed on the same four measures, by the same team, so this number can be compared directly against any other project on this site.
How dangerous the crossing is today: flood frequency, water speed and recorded incidents.
How many people depend on this crossing, and how often they have to make it.
What sits on the other side: schools, clinics, work, and whether any alternative route exists.
People served per Rand of build cost. It sets the order we build in, never whether we build.
A lower score is not a rejection. Every project listed is one we intend to build; the score sets the order, not the outcome.
Additional engineering measures required, such as raised approaches, scour protection or debris management.
Each measure is scored 1 to 5 from field assessment, CSIR flood data and community records, then weighted and converted to a mark out of 100.
Who is affected
Peri-urban/rural-fringe communities from clinics, schools, and workplaces.
What has happened at this site
The bridge was washed away in the 2022 floods, completely isolating these peri-urban/rural-fringe communities from clinics, schools, and workplaces. Nearby bridges (e.g., Shallcross/Queensburgh links) have also been repeatedly damaged and repaired by residents themselves.
Public benefit when complete
Short-span steel deployment would quickly restore access and build resilience in flood-prone valleys giving more than 15 000 people daily usage and access to essential services.
Your donation costs less than you think.
Bridging Africa NPC is a SARS-registered PBO (334-275-NPO). Your donation qualifies for a Section 18A tax deduction, up to 10% of your taxable income per year.
Calculate your tax benefit →